Beijing metro Line 12 main structure to be finalized in 2019

The Beijing Municipal Commission of Transport has announced that the main structure of metro line 12, which will run east and west through northern Beijing, will be finished by 2019. The line, with a total length of 29.6 kilometers, will have 21 stops, 15 of which are transfer stations, the commission said. About 60 percent of construction work has begun.
The line is expected to become operational in 2021. It will start at Sijiqing Bridge near the west fourth ring road and end in the Dongba area near the east fifth ring road in Chaoyang district.
By the end of 2017, Beijing’s metro system measured 608 kilometers. By the end of 2018, the system will be extended to 630 kilometers. Beijing now has 22 metro lines.


Share on:
Facebooktwitterlinkedinmail

 

RECOMMENDED EVENT: