Alstom delivered SmartLock400 interlocking signalling system to Victoria

Smartlock-1Alstom has successfully supplied, tested and commissioned its SmartLock 400 interlocking signalling system for the Melbourne suburban network, as part of the Burke Rd Level Crossing removal project which consists of removing 50 of Victorias most dangerous and congested level crossings over the next eight years.
Removal of the level crossings and installation of SmartLock 400 deliver significant safety improvements for drivers and pedestrians and improves travel around Melbourne.
Smartlock 400 is the latest evolution in Alstom’s Smartlock family and benefits from 30 years of worldwide return on experience. It is suited for all railway topologies with a centralised or distributed architecture and is applicable for both new and existing installations. The technology offers very high reliability and operational functionality that maximises safety and punctuality.

Photo: Alstom


Share on:
Facebooktwitterlinkedinmail

 

RECOMMENDED EVENT: