Sofia: Trace Group to build another metro section

14-sofiaBulgarian construction company Trace Group Hold has signed a 29.8 million leva (15.3 million euros) deal for the construction of a 630-metre section of the third line of Sofia’s metro network. The section will include one station, Trace Group Hold said.

In October 2015, Trace Group Hold signed a 75.6 million leva (38.6 million euros) deal for the construction of another section of the third metro line. That section, which comprises two stations and one tunnel, is 1.6 km long.


Share on:
Facebooktwitterlinkedinmail

 

RECOMMENDED EVENT: